ELECTRIFYING plans which would lead to a greener future for part of the rail network in the Borders have been disclosed.
Network Rail has submitted a screening request to Scottish Borders Council over plans for the rail electrification, with associated overhead line equipment and gantry, between Newcraighall Junction and to the southwest of Sherriffhall Mains and at land between the south of Bowshank Tunnel and Tweedbank Station.
The area is currently non-electrified and is approximately 15.5km of single track line.
A spokesperson for Network Rail said: “The project will involve a number of physical interventions to the existing railway infrastructure to deliver the electrification of the line.
“During the construction phase there may be a temporary increase in emissions, but mitigation measures will be put in place. Longer term, the development will allow a move to greener electric trains and have a positive impact on air quality standards and reduce reliance on the car.”
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here